<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

    2020-07-21 16:25:04

    Share
    • Share to WeChat Moments

    Infrared temperature measurement forging furnace

    • Description

    Operation steps of infrared temperature measurement forging heating furnace

    1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    Maintenance of Forging Furnace with Infrared Temperature Measurement

    When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

    高頻10.jpg



    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 日本A网免费在线观看| 亚洲av无码片在线播放| 国产免费播放一区二区三区| 国产精品AV一区二区三区不卡蜜| 亚洲av无码久久精品狠狠爱浪潮| 国产精品自在拍首页视频| 人妻18毛片a级毛片免费看| 伊人久久大香线蕉av不变影院| 岛国无码小电影在线观看| 国产激情一区二区三区四区| 精品无码国产污污污免费网站| 欧美野战青青久久| 亚洲人妻精品一区二区| 最近2019好看的中文字幕免费 | 午夜a理论片在线播放| 粉嫩国产一区二区三区在线| 被老外添嫩苞添高潮NP| 五月天在线观看中文字幕AV| 久久综合久色欧美综合狠狠| 久久久久精品一本| 国产成人综合久久亚洲精品| 91久久综合亚洲| 国产精品久久毛片影院| 国产精品乱人伦一区| 日韩精品一线在线观看| 在线视频夫妻内射| 精品久久久爽爽久久久AV| 国产精品久久无中文字幕| 国产久热精品无码激情| 免费99精品国产自在现| 丁香花在线视频完整版| 精品国产AⅤ一区二区三区V视界| 18禁超污无遮挡无码免费动态图| 啪啪啪免费视频| 精品国产模特在线观看| 国产精品不卡一区二区视频| 国产熟女高潮视频| 精品无码一区二区| 亚洲熟妇熟女久久精品一区| 欧美日韩国产在线一区二区三区 | 国产高颜值大学生情侣酒店 |