<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

    2020-07-20 17:48:44

    Share
    • Share to WeChat Moments

    Round steel forging diathermy equipment

    • Description

    圖片012.png

    Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

    1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

    2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

    3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

    4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

    5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

    6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

    7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


    Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

    When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

    高頻10.jpg


    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 亚洲中文字幕综合小综合| 动漫无遮挡h纯肉亚洲资源大片| 美女极度色诱视频国产| 久久精品国产精品| 中文字幕在线播放| 亚洲一区二区三区视频在线| 欧美人成网站在线看| 爆乳2把你榨干哦OVA在线观看| 熟妇人妻av中文字幕老熟妇| 最近中文字幕2018动漫| 2019亚洲午夜无码天堂| 国产激情视频趣趣在线观看的 | 国产一级精品在线免费看| 粗大挺进朋友的未婚妻| 久久AV高潮AV无码AV喷吹| 亚洲人成网亚洲欧洲无码| 国产精品一二三区久久狼| 91精品日本综合久久香蕉蜜桃| 国产精品无遮挡在线观看| 国产综合色产在线精品| 国产精品偷伦视频免费观看了| 亚洲第一二三区日韩国产| 国产日本亚洲一区二区三区| 日韩国产欧美在线视频| 天堂а√在线地址| 激情综合网激情五月俺也想| 国产午夜福利片在线观看| 亚洲av永久无码精品成人| 熟妇人妻久久精品一区二区| 艳mu无删减在线观看免费无码| 日本丰满的人妻HD高清在线| 日产无人区一线二线三线| 中文熟妇人妻av在线| 精品国产区一区二| 一区二区日韩激情综合网| 老熟妇仑乱换频一区二区| 一区二区三区在线观看| 日韩无人区码卡二卡1卡2卡网站| 色帽子国产福利视频| 久久久国产综合精品 | 熟妇人妻久久中文字幕|