<table id="wckv1"><bdo id="wckv1"></bdo></table>
<font id="wckv1"><sup id="wckv1"><tbody id="wckv1"></tbody></sup></font>
    <progress id="wckv1"><abbr id="wckv1"></abbr></progress>
    <center id="wckv1"><ruby id="wckv1"></ruby></center>
    <font id="wckv1"></font>
    久久中文字幕国产精品,久久精品熟女亚洲av艳妇,丰满人妻一区二区三区色,精品午夜福利短视频一区,乱子伦一区二区三区,久久一本人碰碰人碰,天天日夭天淫天天淫天天摸天天射 ,粉嫩蜜臀av一区二区绯色
    Current Location:Home > Product > IF induction series > IF power supply

    2018-10-26 10:13:27

    Share
    • Share to WeChat Moments

    RAZ-400KW intermediate frequency power supply---+---furnace shelf (combination)

    • Description

    Induction Heating Power Supply--Safety Operation Guide


    1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

    2. The operator must prepare corresponding insulating shoes, gloves, etc.

    3. The operator must have the corresponding electrical knowledge.

    4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

    5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

    6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

    7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

    8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

    9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

    10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

    11. After the equipment stops working, wait for five minutes before disconnecting the water source.

    12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


    weekly maintenance

    1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

    2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

    3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

    4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

    5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

    6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


    Semi-annual maintenance

    1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

    2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

    3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

    5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

    7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


    Link to this article:http://www.jk991.com/en/product/product20181026142.html
    Previous:NO!
    Next:NO!

    Recommended Products

    HOME About Us Product News Case Video Advantages Contact
    主站蜘蛛池模板: 尤物福利在线观看| 男女性动态激烈动态图| 亚洲国产精彩中文乱码av| 丰满少妇作爱视频免费观看| 免费观看性欧美一级| 98精品全国免费观看视频| 国产美女深夜福利在线一| 国产精品白浆精子流水| 我和子发生了性关系视频| 九色国产精品一区二区久久| 亚洲深夜精品在线观看| 中文字幕免费专区| 高潮白浆潮喷正在播放| 九九热热久久这里只有精品 | 麻豆免费观看网站| 日本欧美大码a在线观看| 成年女人永久免费看片| 久久精品中文闷骚内射| 午夜福利偷拍国语对白| 日本19禁啪啪无遮挡免费尤物 | 久久精品岛国AV一区二区无码| 色国产在线| 伊人久久大香线蕉aⅴ色| 人人玩人人添人人澡超碰| 亚洲最大无码中文字幕| 四月五丁香婷婷| 真实国产老熟女无套中出| 99精品欧美一区二区三区| 国产鲁鲁| 日韩A级毛片一区二区三区| 少妇伦子伦情品无吗| 日韩在线视频播放| 欧美日韩一区二区三区精品视频| 亚洲 日韩 欧美 春色| 亚洲无码mv| 精品999日本久久久影院| 最近中文字幕高清字幕mv| 无码1卡2卡3卡4卡视频版| 一区二区三区无码免费看| 天堂a√中文在线| 91超碰caoporen97人人精品 |